Simulation Scenario

Settings:

Bidding Strategy
Price Information
Floor price
Boosting

General:

Bidding Area
Simulation Start
Simulation End
Markets

Capacity:

Max Production (kW)
Max Consumption (kW)
Energy Capacity (kWh)
Round Trip Efficiency %

Costs:

Grid Cost (€/MWh)
Degradation Cost (€/MWh)
Aire Commission %

Prequalified Volumes:

Service Max Capacity (kW) Min Capacity (kW) Max Load (kW) Min Load (kW)

Simulated with Aire Core

EUR SEK

Total Revenue (EUR)

Total Cost (EUR)

Total Profit (EUR)

Month Revenue (€) Grid Cost (€) Commission (€) Profit (€) Max Production (kW) Max Consumption (kW)

The revenues displayed in this simulation are based on theoretical performance under the given settings and are intended for illustrative purposes only. Practical limitations, including but not limited to variations in Balancing Service Providers (BSPs), and other operational constraints, may impact actual results. Users should consider these factors and conduct their own assessments before relying on the displayed outcomes.